Cited 65 time in
An integrated multi-objective optimization model for solving the construction time-cost trade-off problem
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Koo, Choongwan | - |
| dc.contributor.author | Hong, Taehoon | - |
| dc.contributor.author | Kim, Sangbum | - |
| dc.date.accessioned | 2024-08-08T03:31:10Z | - |
| dc.date.available | 2024-08-08T03:31:10Z | - |
| dc.date.issued | 2015-04-03 | - |
| dc.identifier.issn | 1392-3730 | - |
| dc.identifier.issn | 1822-3605 | - |
| dc.identifier.uri | https://scholarworks.dongguk.edu/handle/sw.dongguk/17132 | - |
| dc.description.abstract | As construction projects become larger and more diversified, various factors such as time, cost, quality, environment, and safety that need to be considered make it very difficult to make the final decision. This study was conducted to develop an integrated Multi-Objective Optimization (iMOO) model that provides the optimal solution set based on the concept of the Pareto front, through the following six steps: (1) problem statement; (2) definition of the optimization objectives; (3) establishment of the data structure; (4) standardization of the optimization objectives; (5) definition of the fitness function; and (6) introduction of the genetic algorithm. To evaluate the robustness and reliability of the proposed iMOO model, a case study on the construction time-cost trade-off problem was analyzed in terms of effectiveness and efficiency. The results of this study can be used: (1) to assess more than two optimization objectives, such as the initial investment cost, operation and maintenance cost, and CO2 emission trading cost; (2) to take advantage of the weights as the real meanings; (3) to evaluate the four types of fitness functions; and (4) to expand into other areas such as the indoor air quality, materials, and energy use. | - |
| dc.format.extent | 11 | - |
| dc.language | 영어 | - |
| dc.language.iso | ENG | - |
| dc.publisher | VILNIUS GEDIMINAS TECH UNIV | - |
| dc.title | An integrated multi-objective optimization model for solving the construction time-cost trade-off problem | - |
| dc.type | Article | - |
| dc.publisher.location | 리투아니아 | - |
| dc.identifier.doi | 10.3846/13923730.2013.802733 | - |
| dc.identifier.scopusid | 2-s2.0-84929304362 | - |
| dc.identifier.wosid | 000350032200006 | - |
| dc.identifier.bibliographicCitation | JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, v.21, no.3, pp 323 - 333 | - |
| dc.citation.title | JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT | - |
| dc.citation.volume | 21 | - |
| dc.citation.number | 3 | - |
| dc.citation.startPage | 323 | - |
| dc.citation.endPage | 333 | - |
| dc.type.docType | Article | - |
| dc.description.isOpenAccess | Y | - |
| dc.description.journalRegisteredClass | scie | - |
| dc.description.journalRegisteredClass | scopus | - |
| dc.relation.journalResearchArea | Engineering | - |
| dc.relation.journalWebOfScienceCategory | Engineering, Civil | - |
| dc.subject.keywordPlus | GENETIC ALGORITHM | - |
| dc.subject.keywordPlus | TECHNICAL SPECIFICATIONS | - |
| dc.subject.keywordPlus | GLOBAL OPTIMIZATION | - |
| dc.subject.keywordPlus | DESIGN | - |
| dc.subject.keywordPlus | ROBUSTNESS | - |
| dc.subject.keywordPlus | SYSTEMS | - |
| dc.subject.keywordAuthor | pareto front | - |
| dc.subject.keywordAuthor | multi-objective optimization | - |
| dc.subject.keywordAuthor | fitness function | - |
| dc.subject.keywordAuthor | non-dominated solution | - |
| dc.subject.keywordAuthor | construction management | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
30, Pildong-ro 1-gil, Jung-gu, Seoul, 04620, Republic of Korea+82-2-2260-3114
Copyright(c) 2023 DONGGUK UNIVERSITY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
